According to the University of Michigan Kresge Library guide, value stream mapping can be applied to which of the following?
Select one answer.
Why office processes feel slow even when everyone is busy
If your team is constantly busy but requests, approvals, and reports still crawl, the problem usually isn't effort. It's the gaps between steps. Value stream mapping (VSM) is a lean tool that uses a flowchart to document every step in a process, and it's designed to combine processing steps with information flow and related data so you can identify waste and reduce cycle times (ASQ).
VSM was developed at Toyota, which called it a material and information flow diagram, and it remains a core continuous-improvement tool (Lean Enterprise Institute). The good news for office teams: VSM can be applied to transactional areas such as sales, IT, accounting, and finance, not just production (University of Michigan).
What changes when the "product" is information
In a factory, materials move. In an office, information moves — and sometimes internal customers move. In office areas, information flows; in administration, internal customers flow (Nikunj Bhoraniya). That means your map should show:
- The trigger: what starts the process (a request, a ticket, an order).
- The steps: each handoff, review, approval, and system entry.
- The queues: where work waits between steps.
- The information flow: how instructions, data, and decisions travel between people and systems.
A value stream includes all actions, both value-creating and non-value-creating, required to bring a product from order to delivery (Lean Enterprise Institute). Your job is to see both.
Step-by-step: build your first office value stream map
1. Pick one value stream and set the scope
Choose a single, repeating process with a clear start and end — for example, invoice processing from receipt to payment, or a client onboarding request from submission to completion. VSM represents a single area in the organization; start with a facility-level view before drilling into process-level detail so you don't optimize one area while suboptimizing another (ASQ).
2. Form a cross-functional team
ASQ recommends a cross-functional team of about 10 members from across the organization. In office work, that means including the people who actually touch the work — not just managers. Small teams can miss important items; large teams are hard to coordinate.
3. Walk the process and draw the current state
VSM typically begins with a team creating a current state map that captures the actual condition of the value stream, followed by a future state map showing how it should flow (Lean Enterprise Institute). Go where the work happens. Watch the handoffs. Note where work sits waiting.
4. Collect real numbers, not guesses
For each step, record:
- Process time: how long the work actually takes when someone is working on it.
- Lead time: how long the item spends in the stream, including waiting.
- Queue size: how much work is piled up at each step.
- Rework and error rates: how often items come back.
A case study on applying VSM in office and services notes that the total process time and total lead time are two summary metrics, and that the activity ratio is another important summary metric for seeing how much of the time is value-adding (Chalmers).
5. Mark the waste
Look for the classic office wastes: waiting, over-processing (extra approvals), rework, unnecessary motion (chasing information), and defects (wrong data entered). In a real-world example, a value stream map of a service parts order fulfillment process identified duplicate processes unknowingly performed by multiple departments and recommended eliminating the redundant activities to reduce overall cycle time (IMEG).
6. Draw the future state and prioritize
Design a target state that removes the biggest waits and redundant steps. Then pick a small number of changes to test first. The goal is a solid implementation plan that maximizes available resources and uses materials and time efficiently (ASQ).
A practical checklist you can apply this week
- Name the value stream and its start and end points.
- Invite 6–10 people who touch the work across departments.
- Walk the process in person and list every step and handoff.
- Record process time and lead time for each step.
- Calculate total lead time and total process time; compare them.
- Flag the three biggest queues and the three biggest rework sources.
- Draft a future-state map with fewer handoffs and approvals.
- Choose one change to pilot within 30 days.
- Set a baseline metric (lead time, error rate, or activity ratio) to track.
Common mistakes to avoid
- Mapping from memory. Draw the current state from observation, not from the process document.
- Skipping the information flow. Office waste often hides in how instructions and data travel.
- Mapping too broadly. Start with one value stream, not the whole organization.
- Stopping at the map. A map without a future state and an action plan is just a diagram.
How the Featured Expert Can Help
Windy Hill Partners, led by Bob Buckwalter, CSSBB, PMP, MBA, provides Lean Six Sigma and process improvement consulting. The firm reports 20+ years of process improvement experience, $20M+ in documented financial impact, and work across 6 industries. Its approach focuses on helping organizations break the cycle of operational chaos — reducing costs, cutting errors, and equipping teams with tools to sustain improvement. Learn more at Windy Hill Partners.
Test your understanding
Value stream mapping can be applied beyond manufacturing. Which of the following is a documented application area for VSM?